Cost: $3,110,000
To develop and provide sewer service to a large district in Bossier Parish
Cost: $336,000
This project consists of the reconstruction of 0.8 mile of existing two 7-foot lanes of asphaltic roadway, beginning at its intersection with LA Hwy 3 just south of Vanceville, running parallel with LA Hwy 3 west of adjacent railroad. The proposed improvements consist of the two 11-foot lanes of asphaltic concrete pavement on a 24-foot cement treated base.
Cost: $240,000
Planning and Construction.
Cost: $168,000
This project consists of the reconstruction of 0.5 mile existing two 9-foot lanes of gravel road beginning at the end of the existing paved section of Crouch Road, southeast of the end of Crouch Road for 0.5 mile. This project begins 4.5 miles south of the intersection of Crouch Road and LA Hwy 162 in the vicinity of the common corner of section 17, 18, 19 and 20, T20N, R13W, in Bossier Parish. The proposed improvements consist of two 10-foot lanes of asphaltic concrete roadway on a 22-foot cement treated base. The project will complete the paving of Crouch Road and provide an all-weather road for the public.
Cost: $1,320,000
This project consists of the reconstruction of 5.0 miles of existing two 9-foot lanes of asphaltic pavement, beginning at the intersection with LA Hwy 160 at Ivan and ending at its intersection with LA Hwy 160 in the vicinity of the Ivan Lake Road in Bossier Parish. The proposed improvements consist of two 10-foot lanes of asphaltic concrete pavement on a 22-foot cement treated base.
Cost: $3,240,000
This project consists of the relocation and realignment of an existing 2-lane gravel road, 18’ width, for a distance of 2.2 miles. The proposed improvements consist of constructing two 12-foot lanes with 10 foot shoulders on a stabilized base. Additional right-of-way and utility relocation will be required. The project begins at LA Hwy 3 approximately 3.9 miles north of the intersection of LA Hwy 3 and LA Hwy 160 and ends at the Old Plain Dealing Road in the vicinity of the Bossier Parish Correctional Facilities located on the Old Plain Dealing Road.
Cost: $294,000
This project consists of the reconstruction of 0.5 miles of two 8-foot lanes of existing gravel road located 0.6 mile north of Oakland intersection LA Hwy 157. The proposed improvements consist of constructing a cement treated base 22’ wide and asphaltic concrete paving 20’ wide. An existing gas line valve will have to be relocated to construct this roadway.